NEWS

June Newsletter

INSIGHT NEWS WORKS VIEW ALL

JUNE

 

INDUSTRY NEWS

THE ACCOUNTABILITY SHIFT

The recent administration of Ardmore has highlighted a significant shift in construction. Through the Building Safety Act, the courts have shown a willingness to extend liability beyond the original contracting company to associated businesses where appropriate.

For the industry, this is an important step forward. Success should be measured by quality of delivery, not corporate structure. Contractors should succeed because they consistently deliver well, not because liabilities can be separated from profitable parts of the business.

This change reinforces the importance of healthy margins. They demonstrate successful project delivery through quality, careful planning and collaboration across the supply chain.

Ultimately, stronger accountability benefits everyone. It rewards businesses that stand behind their work, gives clients greater confidence and encourages an industry where quality and long-term performance define success.

 

V&A: DEEP DIVE

 AJMER COLONNADE

Works within the South Asia Gallery have now progressed to one of the most critical stages of the project. Alongside the careful removal of the screed to expose the Grade I listed mosaic floor, our team has begun the enabling works for the dismantling the Ajmer Colonnade, an architectural feature originally constructed in India around 1615.

The methods developed for these works are being closely monitored for vibration and dust to protect the priceless objects within the gallery and the surrounding museum spaces. We are pleased to report that the initial works have progressed well, with vibration transfer remaining comfortably within the project’s strict thresholds. One of the unique aspects of working at the V&A is the opportunity to see our previous projects at different stages of their journey.

From the South Asia Gallery we can now look across to the completed curated Gilbert Gallery, our first project at the museum, while the neighbouring gallery, where we completed the strip out earlier this year, has already entered its fit out. It is not often we have the opportunity to see the finished result after our enabling works are complete.

It is a reminder that our work is the first chapter in every successful refurbishment.

The colonnade comes from a royal pavilion at Ajmer and date from the reign of Jahangir (1615-1620). The style reflects the eclecticism of Mughal art.

 

AI INTEGRATION

STEPPING INTO THE FUTURE

Over recent months we’ve spoken about the increasing role of data, technology and AI in strengthening how we deliver projects. This month marks the next step.

FDS Live is our own platform for managing and reporting live works. Every day, our site teams capture measurable progress across each work front. That information is continually reconciled against programme, giving an increasingly accurate forecast as the project develops.

For clients, this means a live view of project performance rather than waiting for the next meeting. Programme progress, period reporting and workflow status are all available against the original baseline, providing a transparent picture of delivery as it happens.

The 2.0 release now places that information directly into our clients’ hands across live projects. Better information leads to better decisions, fewer surprises and greater certainty for everyone involved. The graph shown on the downloadable PDF is just a snapshot of the insight the platform provides. We’re excited to see the value it creates for everyone involved.

Download PDF

RECENT POSTS